Buy the Right Printing Machine With Confidence

A practical roadmap for defining your production needs, evaluating suppliers, reviewing technical proposals and preparing for machine acceptance.

Start Your Buying Journey →

Your Equipment Purchasing Roadmap

Work through these six stages before committing to an industrial printing machine.

01

Define the Product

Record substrate, shape, dimensions, print area, artwork and surface condition.

02

Set Production Targets

Estimate demand per shift, product mix, working hours and required good-part output.

03

Specify the Process

Confirm color count, positioning tolerance, ink system, pretreatment and curing needs.

04

Request Comparable Quotes

Ask suppliers to quote against the same requirements, tooling scope and delivery conditions.

05

Validate the Solution

Review sample results, production cycle, changeover, safety and acceptance criteria.

06

Plan Installation

Prepare utilities, factory space, operator training, spare parts and technical support.

Before You Request a Quote
Be Specific.

A Better Brief Leads to a Better Proposal.

Use this checklist to prepare the information a machine builder needs to assess your application. The items can also be copied into your RFQ.

Machine RFQ Checklist

Tick off each item as you prepare your inquiry.

How to Evaluate a Machine Supplier

Request evidence against your own application. A polished brochure alone cannot establish whether a machine meets your production requirements.

Evaluation areaQuestions to askEvidence to request
Application experienceHas the supplier handled similar products and materials?Relevant sample prints, application videos and project references.
Technical capabilityCan the proposed setup meet the agreed print and cycle requirements?Written specifications, trial results and tooling details.
Build quality and safetyAre electrical safety, guarding and maintenance access addressed?Applicable compliance documentation and inspection records.
Service supportHow are troubleshooting, spare parts and remote support handled?Support scope, response process and spare-parts recommendations.
Commercial clarityWhat is included and excluded from the quoted price?Itemized quotation, payment milestones and delivery terms.

Plan Acceptance Before Production

Agree on measurable acceptance conditions before manufacturing begins, rather than relying on subjective descriptions such as “high precision” or “high speed.”

01 / PRINT QUALITY

Sample Validation

Approve the product, artwork, color, adhesion and appearance under agreed test conditions.

02 / PRODUCTION

Cycle and Yield

Define how output is measured, what counts as a good part and which operating conditions apply.

03 / HANDOVER

FAT and Training

Document functional checks, safety checks, operator training, manuals and handover items.